The work is expected to start at about 6 a.m. A PennDOT maintenance crews will be conducting repair work on the Route 283 bridge that crosses over the roadway between the turnpike and I-283.
Joe Elias | jelias@pennlive.com, The Patriot-News
Sat, 08/23/2014 - 5:45am
The work is expected to start at about 6 a.m. A PennDOT maintenance crews will be conducting repair work on the Route 283 bridge that crosses over the roadway between the turnpike and I-283.