The project includes building a drainage mainline on Requa Avenue from Oasis Street down to Jackson Street, where there is currently no storm drain, with interconnecting storm drains on adjacent downtown streets.
Palm Springs Desert Sun, The Desert Sun
Mon, 09/27/2021 - 1:39pm
The project includes building a drainage mainline on Requa Avenue from Oasis Street down to Jackson Street, where there is currently no storm drain, with interconnecting storm drains on adjacent downtown streets.