The design of a water line extension for about 112 homes in the path of a slow-moving groundwater contamination plume is underway.
The Daily Gazette stories, The Daily Gazette
Wed, 10/22/2014 - 3:14pm
The design of a water line extension for about 112 homes in the path of a slow-moving groundwater contamination plume is underway.