The $63M Saints ballpark in St. Paul’s Lowertown is 60 percent done, and its “design-build” construction method made changes possible along the way.
Business, Minneapolis Star Tribune: Business
Thu, 11/20/2014 - 3:13pm
The $63M Saints ballpark in St. Paul’s Lowertown is 60 percent done, and its “design-build” construction method made changes possible along the way.