Purple Line construction and Metro rehabilitation work mean either a shutdown or weeks of single-tracking on the eastern end of the line.
Katherine Shaver, Washington Post: Local
Sat, 01/19/2019 - 6:20pm
Purple Line construction and Metro rehabilitation work mean either a shutdown or weeks of single-tracking on the eastern end of the line.