The last fire inspection at Pulse was conducted in late May when an inoperable door was discovered.
The Associated Press, New Orleans Times-Picayune
Tue, 06/28/2016 - 10:02am
The last fire inspection at Pulse was conducted in late May when an inoperable door was discovered.