Crews will pour a concrete deck on the east leaf lift span. The bridge must close in both directions because vibrations caused by traffic can damage the new pour.
Rosemarie Stein | The Oregonian/OregonLive, Portland Oregonian: Local
Thu, 07/20/2017 - 7:30am
Crews will pour a concrete deck on the east leaf lift span. The bridge must close in both directions because vibrations caused by traffic can damage the new pour.